Progress done:1)To hacking and plaster cement back the floor 2)To demolish old damage mild steel angle track way,change,heavy duty sliding gate new mild steel roller,new sliding dylon sliding roller and repair welding the frame damage area paint - Port Klang
Progress done:1)To hacking and plaster cement back the floor 2)To demolish old damage mild steel angle track way,change,heavy duty sliding gate new mild steel roller,new sliding dylon sliding roller and repair welding the frame damage area paint - Port Klang Sliding Gate Repairing Work Selangor, Malaysia, Kuala Lumpur (KL), Shah Alam Supplier, Suppliers, Supply, Supplies | GALAXY STRUCTURE & ENGINEERING SDN BHD

Sila tinggalkan pertanyaan anda disini, kami akan balas secepat mungkin.


*only support gif, jpeg, jpg, png, pdf
Switch To Desktop Version